<menuitem id="xt5xh"></menuitem>
<cite id="xt5xh"></cite>
<menuitem id="xt5xh"></menuitem>
<menuitem id="xt5xh"></menuitem>
<var id="xt5xh"><span id="xt5xh"></span></var>
<var id="xt5xh"><video id="xt5xh"></video></var>
<var id="xt5xh"></var>
<ins id="xt5xh"><span id="xt5xh"><var id="xt5xh"></var></span></ins>
<cite id="xt5xh"><video id="xt5xh"><menuitem id="xt5xh"></menuitem></video></cite>

Columbia Mills Parking Deck

With construction underway on a brand-new children’s museum next to one of the state’s most historic riverside tourist attractions, parking was an issue that required a creative plan. McCrory’s solution, project-managed by LCK, was a 367-car garage to support the limited surface parking shared by the South Carolina State Museum and EdVenture.

"This project presented a number of hidden conditions. In building this deck in 150 days, your team accomplished a feat."

Senior Project Manager

Though facing a limited budget, compressed timeline, and lack of as-builts identifying underground infrastructure, McCrory successfully erected the two-story garage next to the mill’s basement, which called for significant structural underpinning to ensure stability. Despite the building’s partial demolition, careful staging ensured that museum employees never lost a day of work. The parking deck blends so well with the historic building, visitors often think it’s part of the original structure.

  • 2-level, 367-car capacity deck
  • Unattended meter format
  • 150-day fast-track completion
  • Structural underpinning
大屁股肥熟女流白浆,玩丰满女领导对白露脸视频,民工把我奶头掏出来,人间绝色BY随侯珠
<menuitem id="xt5xh"></menuitem>
<cite id="xt5xh"></cite>
<menuitem id="xt5xh"></menuitem>
<menuitem id="xt5xh"></menuitem>
<var id="xt5xh"><span id="xt5xh"></span></var>
<var id="xt5xh"><video id="xt5xh"></video></var>
<var id="xt5xh"></var>
<ins id="xt5xh"><span id="xt5xh"><var id="xt5xh"></var></span></ins>
<cite id="xt5xh"><video id="xt5xh"><menuitem id="xt5xh"></menuitem></video></cite>